Job Detail

Structural Design of Headpond with Desander Outlet Gate for Hydropower Project (8 MW)

End Date: Apr 10 2025

US$ 70 - 140

2 bids
We are looking for a qualified Civil or Structural Engineer with experience in hydropower structures to carry out the structural design of a concrete M25 headpond connected to a desander outlet gate. The design needs to comply with Indian Standard codes or ACI codes and be performed using SAP 2000. The project involves stability checks either manually or via the software (SAP 2000). The headpond is part of a headworks system for an approximately 8 MW hydropower project. The work needs to be completed within 10 days from the project initiation. Deliverables include the SAP 2000 model files, and a manually sketched reinforcement drawing in provided concrete outline drawing suitable for drafting. Applicants with proven experience in similar hydropower-related structural designs will be preferred. Simple guidance might be given for structural modeling, analysis and design but the designer must have prior experience in SAP 2000 and hydropower structural design. The design work will be reviewed by experts for finalization.
2 freelancer(s) are bidding
Damping
@Damping

Dear Sir, I have been working as a freelance structure engineer in hydropower projects in Nepal. I am well aware of general size of headpond and gate structure for 8 MW projects. I am confident that I will be able to deliver the work with in the promised time though I may need your general guidance for stability calculation from SAP.

more
125 in 7 days
★☆☆☆☆
Mahesh
@Mahesh

I possess experience in performing structural analysis of head ponds using SAP software, including evaluating the stability and integrity of the dam or structure, analyzing load-bearing capacities, and ensuring compliance with the IS code and ACI code.

more
125 in 10 days
★★★★★