Top Jobs

$ 40 - 80

6 bids

We are looking for a qualified Civil or Structural Engineer to review a 500 sqm, 1.5-storey control building design in Nepal following ACI code. The reviewer needs to create their own SAP2000 model to verify the results presented in the report. The review needs to be completed within 4 days of assignment. Engineers with relevant design experience are encouraged to apply.

Structural Design of Headworks for 8MW Hydropower Project

Bid End Date: Feb 07, 2025 (Bid Closed)

NRs 1 - 80000

2 bids

We are looking for a skilled Civil or Structural Engineer to perform the structural design of headworks, including intake, gravel trap, flushing gate, undersluice, and spillway (all monolithic), for an 8MW hydropower project. The design must follow Indian Standards (IS code) and use SAP 2000 for analysis, with stability checks conducted either through software or manually. The material type specified is Concrete M25, and deliverables include SAP models, manual sketches of rebar and section details for drafting, report summary. The work must be completed within one week from project initiation. Engineers with prior experience in similar designs are preferred. The results once delivered will be reviewed by experts and may need to amend accordingly

Design Review of Spillway Stoplog Gate

Bid End Date: Jan 29, 2025 (Bid Closed)

NRs 2000 - 6000

2 bids

We are seeking an experienced professional to conduct a design review of a spillway stoplog gate with the following specifications: opening height of 14.5m, design head of 14m, and a vertical lift slide type gate, designed according to IS 5620-2006. The ideal candidate should have expertise in structural or mechanical engineering, with prior experience in similar designs. The review is expected to be completed within 2 days of initiation.

Structural Engineer for Heat of Hydration Analysis

Bid End Date: Jan 19, 2025 (Bid Closed)

NPR 15000 - 35000

3 bids

We are seeking a skilled Structural Engineer with expertise in heat of hydration analysis using professional software such as MIDAS or equivalent. The project involves analyzing a stilling basin with a raft thickness of approximately 7m, covering an area of 21m x 21m, and vertical walls measuring 5m in thickness and 15m in height. The concrete grades are M30, with M50 for the top layers. The primary objective is to determine the optimal concreting intervals and the maximum allowable concrete lift thickness to ensure tensile stresses remain within permissible limits, preventing cracking due to heat of hydration. Candidates with experience in large-scale concrete structures and advanced thermal stress analysis are highly encouraged to bid.

Heat of Hydration Analysis for M50 Concrete

Bid End Date: Jan 05, 2025 (Bid Closed)

NRP 15000 - 30000

2 bids

Project Title: Heat of Hydration Analysis of 500mm M50 Concrete with Cement Content of 470kg/m³ Job Description: We are seeking a highly skilled civil or structural engineer to perform a comprehensive heat of hydration analysis for M50 concrete with a thickness of 500mm and a cement content of 470kg/m³. The analysis must be conducted using professional software such as MIDAS Civil or equivalent tools. Scope of Work: Analyze the heat of hydration and its effects on the concrete structure. Generate results showing: Maximum temperature rise. Maximum stress. Crack ratio and allowable cracks. Determine if the specified cement content of 470kg/m³ is acceptable for practical use based on the analysis. Submit a detailed report of the findings, including all data and conclusions, within one week of work initiation. Required Expertise: Civil Engineering or Structural Engineering background. Proficiency in thermal and structural analysis using software such as MIDAS Civil or similar professional tools. Strong analytical skills and experience in concrete material analysis. Deliverables: Detailed report with clear results, charts, and explanations. Recommendation on the practical acceptability of the cement content for the given application. Timeline: The project must be completed and results submitted within 7 days of starting.

Civil Engineer for Bar Bending Schedule Review (Urgent)

Bid End Date: Dec 25, 2024 (Bid Closed)

NRP 2500 - 5000

2 bids

We are seeking a seasoned Civil Engineer with expertise in reinforcement bar bending schedules and strong knowledge of ACI codes to conduct a detailed review of an upstream apron for a hydraulic structure. The scope includes verifying bar lengths, quantities, and diameters for an apron measuring 20m x 15m x 2m, ensuring full compliance with the provided structural drawings. This is a time-sensitive project, and the completed review must be delivered within 3 days of initiation. Applicants should have extensive experience in RCC structures, exceptional attention to detail, and the ability to deliver accurate results under tight deadlines. If you meet these criteria and are available to start immediately, please send your resume and relevant project experience for consideration.

We are seeking an experienced architect or civil engineer to convert an old PDF building drawing into an accurate AutoCAD drawing. The building has a plinth area of approximately 1500 sq. ft. and a total built-up area of about 3500 sq. ft. While most of the original design will remain unchanged, the staircase section needs to be modified as part of the update. This project is time-sensitive, as the municipality requires the building to be documented (अभिलेखिकरण) by the end of Poush 2081 BS (January 10, 2025). Professionals familiar with Godawari Municipality regulations and processes are strongly encouraged to apply. If you have expertise in AutoCAD, a keen eye for detail, and experience with municipal documentation, we look forward to working with you on this project!

Design Review of Transmission Tower

Bid End Date: Dec 21, 2024 (Bid Closed)

NRP 3000 - 6000

2 bids

We are seeking freelance engineers to perform a design review of detailed structural analysis and design calculations for 220kV single-circuit transmission towers utilizing "ACSR Twin Bison" conductors. The review must be conducted in accordance with Indian standards. The assignment is to be completed within 2 days of project initiation.